Congressional Budget Justification, FY 2019

Executive Summary

 

(in millions of $) FY 2017 Enacted FY 2018 CR Rate Annualized FY 2019 Request
Total Appropriation/Request 905.0 898.9 800.0
  Compact Assistance 671.0 666.4 557.5
  Threshold Programs 30.0 29.8 26.6
  Compact Development/Oversight:
609(g) and Due Diligence
94.0 93.9 109.0
  Administrative Expenses 105.0 104.3 102.4
  Office of the Inspector General 5.0 4.5 4.5

The Millennium Challenge Corporation (MCC) is requesting $800 million for fiscal year (FY) 2019, to support compacts in Tunisia, Burkina Faso, and Sri Lanka and the development of compacts in Timor-Leste and Lesotho, both of which were selected in December 2017 as eligible to develop compacts.  This request will advance U.S. values and interests overseas through partnerships that fight poverty, spur economic growth, and support stability in regions of significant strategic importance. MCC selects partner countries based on hard data and rigorous analysis, and results are evaluated, monitored and publicly shared. Our business-like approach is aligned with the Administration’s priority of ensuring that the Federal Government maintains responsible and transparent stewardship of U.S. taxpayer dollars.

MCC’s operations are guided by the same core principles the agency was founded on 14 years ago and are in line with the Administration’s focus on evidence-based decision-making, evaluation, and partnership with the private sector. With a goal of advancing developing countries from aid partners to trade partners, MCC’s singular mission of spurring economic growth has been demonstrated to be one of the most effective ways to achieve widespread and lasting reductions in poverty in the developing world. By holding itself and its partner countries accountable for results and continued good governance, MCC advances U.S. security, values, and prosperity. MCC’s competitive selection system, which rewards political and economic policy advances, directly supports the President’s priority of incentivizing reforms, as stated in the National Security Strategy. And with cost-effective projects, a lean staff, and an evidence-based approach, MCC is a good investment for the American people.

The agency’s focus on transparency and accountability for results continues to be recognized.  MCC was ranked #1 among U.S. Government agencies and #2 overall in Publish What You Fund’s most recent 2016 Aid Transparency Index, released in April 2016. In addition, for the second consecutive year MCC received the highest score of all federal agencies measured in Results for America’s 2017 “Federal Invest in What Works Index”.  The index highlights the extent to which federal agencies build the infrastructure necessary to use data, evidence, and evaluation in budget, policy, and management decisions.

FY 2019 will be a critical year for MCC and its partners, with transformative programs in several countries on target to be presented to MCC’s Board of Directors and signed in FY 2019. Specifically, the FY 2019 request will support compact development in Tunisia, Burkina Faso, and Sri Lanka. These partnerships will advance economic growth and help people lift themselves out of poverty.

  • Tunisia’s compact provides a unique opportunity to collaborate with a high-capacity partner and fledging democratic state in an important region of the world, and is expected to address excessive market controls of goods and services, water scarcity, particularly in the agricultural sector of the country’s interior regions, and constraints in these sectors caused by restrictive labor market regulations.
  • Burkina Faso’s second compact with MCC will focus on access to energy and human development. MCC is currently working with the compact development team in Burkina Faso to identify specific problems within these sectors. Investments will potentially focus on improving the production, transmission and distribution of electricity, as well as using targeted investments to improve access to and the quality of secondary and vocational education.  Initiatives will also focus on strengthening the institutional, legal, and operational frameworks of each sector.
  • Sri Lanka’s compact will focus on modernizing the country’s transportation and land management sectors. These interventions are aimed at reducing transport bottlenecks and congestion in the Western Province and between the Western Province and other regions; and optimizing the use of state lands for commercial purposes.

MCC’s FY 2019 request also represents an opportunity to expand on the success of MCC’s model and to continue efforts to maximize agency efficiency and effectiveness, as laid out in MCC’s Agency Reform Plan.  Key elements include:

  • Maintaining MCC’s rigorous oversight model and commitment to learning, which includes continuous review of compact and threshold programs, eliminating activities when appropriate via regular monitoring mechanisms, and oversight by MCC’s Board of Directors. In FY 2019, MCC anticipates the development of programs in up to 10 countries with another 16 programs in implementation. Continuous monitoring and regular portfolio reviews are an important step in ensuring the agency is maximizing the impact of investments.
  • Managing the annual country eligibility process for compact and threshold programs. MCC’s competitive selection process is a data-driven, transparent method for determining which countries meet MCC’s stringent governance standards. To be considered for MCC funding, countries must first pass MCC’s scorecard—a collection of 20 independent, third-party indicators that measure a country’s policy performance in the areas of economic freedom, investing in its people and ruling justly. The tool represents one of the many ways MCC is distinctive in how it works to combat poverty through economic growth around the world.
  • Strengthening the environment for private enterprise in MCC partner countries through critical public policy reforms and institutional capacity building to create an enabling environment for investment. MCC will continue to collaborate with the private sector in the design, implementation and sustainability of compact and threshold programs and to seek co-investment opportunities and/or follow-on investments that leverage host country and MCC resources for potential public-private partnerships. An “Opening Markets” section has been included at the end of this Executive Summary section outlining some examples of potential opportunities that may exist within MCC’s current portfolio of programs.
  • Establishing a strong and dynamic knowledge management system, business practices, and tools to systematically share and deploy learning and results internally, externally and with MCC’s partner countries, with the goal of improving efficiency in the development and implementation of country programs and increasing MCC’s impact.
  • Implementing a new business process that streamlines burdensome reporting requirements by MCC’s country teams and consolidates existing programmatic information into a single comprehensive document for each country program—the Star Report. The Star Report collects critical information throughout a program’s lifecycle in areas like performance, sustainability and lessons learned, serving as a core document of record for the agency, and a go-to resource for Congress and external stakeholders after a program is completed.
  • Continuing to identify efficiencies throughout the compact development process with the goal of reducing development time while maintaining—or even improving—the quality of MCC’s programs. MCC’s refined investment criteria and new compact development guidance and an agency-wide “efficiency challenge” will contribute to this effort.
  • Taking advantage of advances in cloud computing and enterprise software management to reduce operating expenses while improving service quality, staff productivity, and information security. Cost savings will allow for additional capital investments in software solutions that support and automate core business processes, further improving staff and agency productivity.
  • Developing and implementing new Integrated Program Management (IPM) guidelines to help country partners establish easy-to-use cost, schedule, risk, communications, and change management systems that will provide managers the input necessary to understand compact priorities, potential risks, and upcoming decision points. This in turn will improve cost and schedule efficiency as well as project quality, allowing MCC’s funds to go further and have a greater impact.
  • Enhancing MCC’s workforce through an organizational and training needs assessment, and applying a new workforce demand model to enable proactive workforce management based on future business needs.

In addition to the above, in FY 2017, MCC began implementing a new internal budget framework called the Integrated Planning, Budgeting, and Execution (IPBE) system. The main objective of IPBE is to improve internal oversight of MCC’s limited resources, while improving transparency and accountability throughout the agency. The implementation of this framework will position MCC to better integrate budget formulation with execution exercises. This will provide MCC senior leadership with the necessary financial information to make strategic decisions and provide further support and accuracy in MCC’s external budget requests.

The efforts described above build upon goals identified in MCC’s current strategic plan, NEXT, as well as MCC’s corporate priorities for FY 2018, which include:

  • Advancing and delivering high-quality compact and threshold programs;
  • Strengthening organizational health and effectiveness;
  • Enhancing and enabling operational and technical agility and innovation; and
  • Advancing MCC policy initiatives.

Going forward, MCC’s incoming leadership team may choose to update the agency’s strategic plan to further enhance MCC’s singular mission, reinforce and deepen the model, and expand the agency’s impact and reach.

The following sections will discuss how MCC’s funding will support compacts in Burkina Faso, Tunisia, and Sri Lanka, future threshold programs, 609(g) assistance, due diligence, administrative expenses, and the Office of the Inspector General.

Opening Markets

Supporting private investment in partner countries

A key objective of MCC is to resolve constraints to private investment in our partner countries in order to reduce poverty through economic growth. In recent years, MCC has increasingly supported public-private partnerships (PPPs) and other broader forms of private sector participation (PSP) to attract business investments in and related to the projects that MCC funds and, more generally, in MCC partner countries.

Some of MCC’s accomplishments in obtaining PPP and PSP support, as well as future opportunities, include the following:

Africa

PPP Support

  • Benin: U.S. companies have expressed strong interest in participating in potential PPPs that will be structured for six solar generation plants totaling 82 megawatts (MW).
  • Cabo Verde: MCC’s second compact supported the Government of Cabo Verde’s exploration of a PPP to complete a land registry as part of a new land information management system.
  • Côte d’Ivoire: This $525 million compact will support the development of a logistics center for cargo movements as a PPP. The center will work to reduce congestion in Abidjan, increase the efficiency of container traffic through the port, and provide necessary services to transporters. It is expected to have spillover benefits for U.S. truck and transportation services.

PSP Support

  • Benin: MCC’s $375 million Power Compact seeks to unlock private investment by supporting policy reforms and investing in electricity generation, distribution, and off-grid electrification. U.S. companies have expressed interest in how grants from the $40 million Off-Grid Clean Energy Facility can facilitate market entry for their business models and technologies.
  • Ghana: GE and Endeavor Energy are developing the Bridge Power project in Ghana, a component of the $4 billion in private sector commitments made at the signing of the $498 million Ghana Power Compact. In addition, MCC will support the improved utility performance of the Electricity Company of Ghana through a management contract concession that will leverage private sector expertise.
  • Malawi: The Malawi Compact will improve the availability and reliability of electricity in the country by increasing the capacity and stability of the national electricity grid, bolstering the efficiency and sustainability of hydropower generation, and strengthening sector institutions, regulation, and governance to prepare for future expansion. These activities include Malawi’s first tender for 70 MW of solar power by independent power producers, which was awarded in May 2017. In addition, a total of 14 U.S.-headquartered firms and individuals have been awarded 18 different contracts totaling approximately $23.2 million in goods, works, and consulting services.

Asia

PPP Support

  • Sri Lanka: A PPP unit was recently set up within the Ministry of Finance and has received initial support from the United States Agency for International Development (USAID), as well as the World Bank’s PPP team and the Public-Private Infrastructure Advisory Facility (PPIAF). In the early stages of compact development, MCC is actively engaging with the PPP unit, USAID, PPIAF, and other donors to determine what support MCC may be able to provide to assist the Government of Sri Lanka in developing and executing one or more successful PPPs in the coming years.

Central America’s Northern Triangle

PPP Support

  • El Salvador: MCC currently is helping the Government of El Salvador to develop PPPs to attract up to $45 million in private investment to modernize the Cargo Terminal at its main international airport, and $25 million to provide street lighting and security cameras on highways around the capital, San Salvador.
  • Guatemala: MCC is supporting the Government of Guatemala in drawing up to $900 million of private capital to build a light rail transit system in Guatemala City, and $75 million to rehabilitate the country’s main international airport in Guatemala City.
  • Honduras: MCC is assisting the Government of Honduras in managing the implementation of several signed road concessions that require more than $300 million in private investment.

PSP Support

  • El Salvador:  The MCC-funded El Salvador Investment Challenge (ESIC) seeks to provide up to $75 million in public goods (e.g., roads, water supply and sanitation, and workforce development) to increase private investment in El Salvador. To date, private investors have proposed more than $250 million in privately-funded projects to ESIC for support.

Engaging U.S. Businesses

MCC actively promotes participation by U.S. firms in MCC-funded overseas procurements.  MCC is engaging prospective U.S. bidders through enhanced collaboration with the Department of Commerce, the U.S. Trade and Development Agency (USTDA), World Bank, U.S. Chamber of Commerce, and others. MCC meets with U.S. firms that are either doing business in MCC partner countries or are interested in exploring these opportunities.  MCC is actively working with the Department of Commerce’s Advocacy Center to reach its network of U.S. firms.

MCC is implementing a detailed market outreach plan to inform, attract, and further encourage U.S. firms to work with MCC. The market outreach plan includes the promotion of MCC and MCC partner-country procurements to targeted U.S. businesses, highlighting the advantages of working on MCC-funded projects while addressing any barriers to participation, showcasing post-compact investment opportunities for U.S. businesses, and building additional avenues for partnership with MCC through co-investment, joint research, knowledge sharing, and program co-design.

Compacts in Development

(in millions of $) FY 2017 Enacted FY 2018 CR Rate Annualized FY 2019 Request
Total Appropriation/Request 905.0 898.9 800.0
  Compact Assistance 671.0 666.4 557.5
    Section 605 535.2
    Section 609(g) Compact Development Funding (CDF) 22.3

*CDF amounts are estimated using MCC’s recent historical average of approximately 4 percent of total compact assistance.

In order to support U.S. global development efforts and maximize investments in the candidate pool of lower income but relatively well-governed countries, MCC is requesting $558 million to support the Burkina Faso and Tunisia compacts currently in development, along with a portion of the Sri Lanka compact.

Burkina Faso

Estimated $304 Million Compact

In December 2016, MCC’s Board selected Burkina Faso to develop a second compact. In February 2017, a high-level MCC delegation officially launched the compact development process. The Government of Burkina Faso has fully staffed the new compact development team and MCC has been actively engaging with this team. MCC has conducted several technical missions over the past months and, together with Burkina Faso’s team, has successfully completed the constraints analysis process, which identified two binding constraints: (1) the high cost and poor quality of energy and low access to it, and (2) a low-skilled workforce. The Government of Burkina Faso approved these binding constraints through a validation workshop and with the Council of Ministers in September 2017. MCC management also officially approved the constraints in September.  MCC and Burkina Faso’s development team are proceeding with root cause analysis and the development of concept notes for both sectors. MCC is projecting to have a compact signed with Burkina Faso by June 2019.

Results of Burkina Faso’s 2009 Compact

MCC’s $480 million compact, which ended in July 2014, was characterized by Burkina Faso’s commitment and high-level engagement. All major conditions to compact funding were met; notably, many of them required significant institutional reforms and others required adoption of major new laws by the National Assembly and issuance of 52 implementing decrees and regulations The compact consisted of projects in land reform, agriculture, transportation, and education. The compact successfully trained 8,700 local officials in lands rights and more than 13,000 land possession certificates were in process by the end of the compact—well over the original target of 6,000. The multifaceted agriculture project constructed 2,240 hectares of irrigated farmland and rehabilitated a dam, protecting investments from catastrophic flooding. MCC funded the paving, upgrade or periodic maintenance of 525 kilometers of roads and supported the development of a new road maintenance planning tool to facilitate future planning and continued management of the country’s road network. The BRIGHT II Schools project built on the education component in the earlier MCC threshold program by assisting in the construction of 396 classrooms and increasing access to girls’ participation in primary school.

Tunisia

Estimated $292 Million Compact

MCC’s Board of Directors selected Tunisia as eligible to develop a compact in December 2016. In August 2017, MCC and the Government of Tunisia’s compact development team completed a joint analysis of the binding constraints to economic growth, which resulted in the identification of three constraints: (1) excessive market controls of goods and services; (2) excessive labor market regulations; and (3) water scarcity, which is constraining development in the interior regions of Tunisia and in the agriculture sector. Following guidance from MCC management and a series of workshops held in Tunis in late September, the MCC and Tunisian compact development teams have completed the root cause analyses for these constraints and are presenting concept notes in early 2018 that will serve as the basis for eventual compact projects. MCC expects to present the compact to MCC’s Board in June 2019.

Sri Lanka

Estimated $450 Million Compact

Sri Lanka was selected for a threshold program in December 2015 and was selected for eligibility to develop a compact in December 2016 after continued improvements in performance as measured by the MCC scorecard. The constraints analysis identified insufficient transport infrastructure and access to land for commercial development as binding constraints to private sector investment and economic growth. MCC and the Government of Sri Lanka are exploring interventions to (1) reduce transport bottlenecks and congestion in the Western Province and between the Western Province and other regions, and (2) optimize the use of state lands for commercial purposes. The Sri Lanka country team is recommending a dual sector compact focused on addressing the transport and land binding constraints through five interventions: an advanced traffic management system; bus sector modernization; logistics facilities; national land information system; and mapping, surveying, and titling of land. MCC completed initial due diligence missions on potential projects in September and October 2017. In early December, MCC’s Sri Lanka team requested management approval to advance to in-depth due diligence of project proposals. MCC aims to sign a compact in early FY 2019.

The chart below and the subsequent pages provide updates for the remaining compacts currently in development, including estimated timing of consideration by MCC‘s Board and compact sizes. Program and sector data for countries already in implementation can be found online on our public website at www.MCC.gov.

Countries and Appropriations Used (in millions of $) Prior Years FY 2018 FY 2019 Total
Board Consideration in FY 2018: Mongolia 350 350
Senegal 302 178 480
Sri Lanka 343 107 450
Board Consideration in Future Fiscal years: Burkina Faso 4 300 304
Tunisia 142 151 292
Lesotho TBD
Timor-Leste TBD
Total 652 666 558

*Amounts may not add up due to rounding.

Mongolia

Estimated $350 Million Compact

MCC’s Board selected Mongolia for a second compact in December 2014.  MCC and the Government of Mongolia are working to develop a compact that seeks to address the imminent water shortage in the capital city and economic center of Ulaanbaatar, which is home to nearly half of the country’s population of 3 million people. MCC is evaluating project options that can increase the bulk water supply for the capital city, particularly in the areas of groundwater wells and wastewater recycling, and support long-term sustainability measures in the water sector. Concurrently, the Government of Mongolia is seeking a complementary wastewater treatment solution that would enable an MCC investment in bulk water supply. The compact is on track for consideration by the Board in late spring or early summer of 2018.

Results of Mongolia’s 2008 Compact

Mongolia completed a $285 million compact program in September 2013, which included projects and activities in land tenure, health, vocational education, transportation, and energy. The results included improving property rights for small herders by formalizing over 19,000 land titles, establishing the country’s first state-of-the-art medical facility for stroke and heart attack patients, modernizing the vocational education system, constructing a paved 176 km all-weather road to access key trading markets, and the sale of over 100,000 fuel-efficient stoves to reduce air pollution in Ulaanbaatar.

Senegal

Estimated $480 Million Compact

MCC’s Board selected Senegal as eligible to develop a second compact in December 2015. MCC and the Government of Senegal identified the high cost of, and poor access to, energy as a binding constraint to growth, along with a challenging business enabling environment. After narrowing the program’s focus to the energy sector, the Government of Senegal submitted draft final project proposals to MCC in mid-October.  MCC is also working to advance infrastructure feasibility studies, a gas-to-power assessment, data collection and verification, and an energy sector road map that will form the technical basis for reforms and investments under a compact. MCC continues to coordinate with other stakeholders, including USAID, Power Africa, and other donors in the sector, including the World Bank, the International Finance Corporation (IFC), and the private sector. MCC expects to present the compact to MCC’s Board in September 2018.

Results of Senegal’s 2009 Compact

Senegal’s completed $540 million compact worked to boost economic growth by unlocking the country’s agricultural productivity and expanding access to markets and services through the two primary compact projects.  These projects — roads rehabilitation and irrigation and water resource management — were geographically focused in the Senegal River Valley in the north and the Casamance region in the south. The compact priorities were identified to align with the country’s long-term objectives of enhancing economic growth and food security. Senegal successfully completed the irrigation project and the vast majority of the roads rehabilitation project. The Government of Senegal committed funds to finish a portion of the highway that was not completed by the end of the compact due to construction delays.

Lesotho

Compact size to be determined

MCC’s Board re-selected Lesotho as eligible to develop a second compact in December 2017 after a two-year hiatus in recognition of Lesotho’s concrete steps over the past year to address MCC’s ongoing rule of law concerns. A senior MCC team is expected to visit Maseru in February 2018 to relaunch compact development, which will begin with a new constraints to growth analysis that should be completed in late FY 2018.

Results of Lesotho’s 2008 Compact

The completed $362.5 million compact with Lesotho comprised projects in water, health and private sector development. The compact funded one of the largest infrastructure improvement projects in Lesotho’s history, the Metolong Dam, as well as work with PEPFAR (the President’s Emergency Plan for AIDS Relief) to mitigate the negative economic impacts of poor maternal health, HIV/AIDS, tuberculosis and other diseases. Approximately 1 million people are expected to benefit from the MCC compact. Further details of the compact results and impacts will be shared in forthcoming impact and performance evaluations, expected to be available beginning in 2017.

Timor-Leste

Compact size to be determined

MCC’s Board selected Timor-Leste as eligible to develop a compact in December 2017, after previously having selected Timor-Leste as eligible to develop a threshold program in December 2016. The Board’s decision this year reflects MCC’s recognition of the Government of Timor-Leste’s clear commitment to good governance, investing in its people and economic freedom, as evidenced by Timor-Leste’s 2018 MCC scorecard. Timor-Leste completed a constraints to growth analysis as part of its threshold program in October 2017. A senior MCC team is expected to visit Dili in February 2018.

Compacts in Development as of FY 2018 Q1

Compacts in Development as of FY 2018 Q1

Compact Development Process Overview

Overview of the Compact Development Process

Threshold Programs

(in millions of $) FY 2017 Enacted FY 2018 CR Rate Annualized FY 2019 Request
Total Appropriation/Request 905.0 898.9 800.0
  Threshold Programs 30.0 29.8 26.6

MCC is requesting $27 million for threshold program assistance. MCC’s threshold program has proven to be an effective tool to incentivize and implement positive policy, regulatory, and institutional reforms in candidate countries and selected partner countries, and the Administration may choose to make greater use of the threshold program in future fiscal years, requiring resources for new programs.

Background

MCC’s threshold program assists promising candidate countries to become compact eligible by offering them the opportunity to demonstrate their commitment to just and democratic governance, economic freedom, and investments in their people. By advancing policy reforms and strengthening institutions to address the most binding constraints to economic growth, threshold programs complement the “MCC Effect” created by the scorecard and allow MCC to assess the opportunity for an impactful and cost-effective partnership before committing to a larger compact. MCC uses the same rigorous, evidence-based approach in threshold programs as it does in compacts, leading to high-quality programs that maximize potential systemic impact and lay the foundation for larger investments.

Threshold programs help countries to reduce constraints to faster economic growth, increase transparency and accountability, and provide MCC critical information about their political will and capacity to undertake the types of reforms that would have the greatest impact in compacts. Current programs are:

  • supporting greater budget transparency and reducing opportunities for corruption in public procurement in Honduras;
  • mobilizing customs and tax revenues, and improving secondary education in Guatemala;
  • creating the foundation for more effective and financially sustainable provision of critical water and electricity services in Sierra Leone; and
  • fostering the use of data for more transparent and accountable governance in Kosovo.

Countries with threshold programs are not guaranteed compact eligibility. However, successful implementation of a threshold program yields significant advantages for a potential future compact. For example, a partner country will likely have enhanced its ability to design and implement investments that will generate the greatest results and have a head start on the work necessary to design a high-impact compact. Even if a country does not become compact eligible, threshold programs can help create the conditions for additional investment from the private sector or by other donors. The programs also help governments to mobilize domestic resources, spend their budgets more transparently, deliver services more efficiently, and ultimately help countries finance their own development.

Threshold Programs in Development

Togo

Selected by MCC’s Board to develop a threshold program in December 2015, Togo has shown improvement on the MCC scorecard in recent years. In FY 2014, Togo passed only 5 of 20 indicators. Togo passed 12 of 20 indicators in FY 2018, including the “hard hurdle” Control of Corruption indicator. The Government of Togo has worked closely with MCC to conduct a constraints analysis and developed an ambitious program to address critical constraints in its information and communications technology (ICT) and land sectors. To address the constraint of poor ICT services, the proposed program would improve access to high quality and affordable ICT services to Togolese citizens by encouraging private sector investments in the ICT sector and developing an independent regulatory regime. In the land sector, the proposed program would expand access to formalized land through the recognition and protection of legitimate land rights in order to accelerate agricultural productivity.

The proposed $35 million Togo threshold program presents the government with a unique opportunity to undertake major reforms in challenging and politically sensitive areas. Promoting competition, encouraging private sector investment, and expanding access in the ICT sector would be a positive step towards Togo becoming a more open and democratic society and fostering a market-oriented economy. Both the ICT and land projects will also challenge deeply rooted sources of corruption. Demonstrated progress on the threshold program would be an important signal of whether Togo would be a good partner for a potential compact in the future.

The Gambia

In December 2017, MCC’s Board selected the Gambia as eligible for threshold program assistance. The selection of the Gambia will give MCC the opportunity to engage with the new government on needed reforms as the country continues its democratic transition. The Gambia is an important partner in West Africa, where MCC already has a strong presence.

Future Programs

The additional funding request for FY 2019 will support programs with new countries that may be selected by the Board. With an average program size of approximately $34 million, the additional funding requested would allow MCC to begin development with an additional country as promising candidates emerge in the annual selection process.

Current Threshold Programs

Honduras

MCC and the Government of Honduras signed a $16 million threshold program agreement in August 2013 to enhance the transparency and efficiency of public financial management, procurement, audit, and oversight of public-private partnerships. In 2017, the government launched a procurement certification program aimed at improving the transparency, accountability, and quality of public procurement by building the capacity of civil servants and requiring that all procurements above a threshold be managed by certified professionals. The program is scheduled to be completed in 2018.

Guatemala

MCC and the Government of Guatemala are partnering to implement a $28 million threshold program. Signed in April 2015, the program is designed to improve the quality of secondary education. In order to increase government spending in social services like education, MCC is also working with Guatemala to mobilize financial resources through reforms in customs and tax administration and by attracting private capital and structuring public-private partnerships for infrastructure.

Sierra Leone

In November 2015, MCC and the Republic of Sierra Leone signed a $44 million threshold program agreement to support policy reforms and improved governance in the water and electricity sectors. By establishing independent regulation, strengthening key institutions, and increasing transparency and accountability, the program will create a foundation for delivery of financially sustainable water and electricity services to the people of Sierra Leone, and limit opportunities for corruption in service delivery.

Kosovo

In September 2017, MCC and the Government of Kosovo signed a $49 million threshold program to implement policy and institutional reforms in two areas critical to economic growth and poverty reduction. To address the problem of demand outstripping the supply of electricity and the high cost of heating, the program will support the government’s efforts to encourage investments in energy efficiency and to promote the adoption of cleaner and cheaper sources of heating. The program will also explore innovative ways to catalyze private sector financing for independent power producers to bring additional energy supply online. To address concerns regarding rule of law and control of corruption in the country, the program seeks to foster a data-driven approach to increase transparency and accountability in key areas including the judiciary and environmental protection.

Compact Development and Oversight

(in millions of $) FY 2017 Enacted FY 2018 CR Rate Annualized FY 2019 Request
Total Appropriation/Request 905.0 898.9 800.0
  Compact Development/Oversight 94.0 93.9 109.0
    609(g) Assistance 22.0 26.6 22.0
    Due Diligence 72.0 67.3 87.0

MCC is requesting $109 million in funding for compact development and oversight in FY 2019. $22 million would be programmed towards assistance under section 609(g) of MCC’s authorizing statute and $87 million would be programmed toward due diligence to support programmatic oversight, quality control, and post-completion work, such as data collection and evaluation.

Pre-compact planning, post-compact evaluations, and oversight are critical to the success of MCC program investments and to ensuring that MCC, partner countries, and the development community are able to take advantage of the learning opportunities inherent in MCC programs.

609(g) Assistance

Assistance provided under section 609(g) of MCC’s authorizing statute represents less than three percent of MCC’s overall request. Nonetheless, 609(g) assistance is critical to the success of compact development and allows MCC to fulfill its goal of developing high-quality compacts more quickly. MCC 609(g) assistance grants help country partners undertake detailed project preparation work on proposed projects. This preparation includes project design studies, feasibility studies, environmental and social impact assessments, engineering and geotechnical designs, economic baseline surveys, technical assessments of financial management and procurement capabilities, and other specialized analyses that help partner countries fully prepare projects that can be implemented within the fixed five-year timeframe, within budget, and provide substantial returns to MCC’s investment.

Due Diligence

Due diligence funds allow MCC to obtain information necessary to evaluate, assess, and appraise proposed projects during compact and threshold program development, to effectively oversee and monitor projects during implementation, and to evaluate the results post-implementation. The number of compacts and threshold programs in implementation is projected to grow between FY 2019 and FY 2020.

Due diligence funding is utilized to procure the technical expertise required throughout the compact and threshold program life cycles and allows MCC to right-size staffing requirements based on the relative size and diversity of the program portfolio. For example, though MCC employs full-time staff with expertise in the agriculture sector, one compact program may include a project that calls for unique knowledge of certain livestock issues. In such a case, MCC might procure external technical expertise to address the niche need. Similarly, if MCC is analyzing the effectiveness of electricity or water utilities across multiple countries, MCC may hire technical expertise to develop an analytical tool to assess the technical and commercial strengths and weaknesses of each utility. Through this procurement strategy, MCC may deploy the same analytical tool during compact development and compare utility performance across multiple compacts.

In addition to program development and implementation, due diligence funds continue to be utilized post-closure of compacts in order to conduct independent evaluations that use rigorous statistical methods to measure changes in beneficiary incomes related to MCC activities. Evaluations provide critical information about program successes as well as valuable lessons on how MCC may continue to improve the design, development, and implementation of future programs with partner countries.

For example, MCC recently undertook a review of its roads projects in order to better design, implement, and evaluate such projects. Through evidence collected across 16 compacts with road projects, MCC uncovered seven key lessons, including the need to prioritize and select projects based on a road network analysis, to standardize content and quality of road data collection across projects, and to consider cost and the potential for learning in determining how road projects are evaluated. This body of evidence and analysis, The Road Principles into Practice paper, was published in November 2017. Most importantly, the lessons from this analysis are already being applied to road projects in Nepal and Côte d’Ivoire.

Due diligence funds also support data and technical expertise needed for calculating economic rates of return for compact projects. Through pre-compact economic modeling of expected economic rates of return, MCC chooses which projects are most likely to generate benefits, specifically, increased income for program beneficiaries, and refines program design to optimize results. Economic modeling done after compact closeout helps to assess the cost effectiveness of the agency’s programs.

Administrative Expenses

(in millions of $) FY 2017 Enacted FY 2018 CR Rate Annualized FY 2019 Request
Total Appropriation/Request 901.0 898.9 800.0
  Total Administrative Expenses 105.0 104.3 102.4
    Human Capital 54.4 54.7 55.2
    Training 1.4 1.2 1.0
    Overseas Operations 10.0 9.0 8.5
    Contracted Services 11.2 10.9 8.9
    Information Technology 14.5 14.6 15.0
    Rent, Leasehold & Improvements 3.8 6.0 6.3
    Travel 9.0 7.4 7.2
    Other Administrative Expenses 0.7 0.5 0.4

MCC is requesting $102 million for administrative expenses in order to support agency operations while maintaining a lean workforce.

MCC has managed a flat-line administrative budget for the last 6 years and has relied on managing inflation through the efficient and effective use of limited funding. In FY 2019, the agency will undergo increased funding pressure largely from inflationary increases in rent and existing personnel costs, which may impede MCC’s ability to continue streamlining business tools and processes.

Some of the initiatives which have helped MCC manage inflationary pressures within the current budget levels include:

  • Negotiated lease savings — In FY 2016, MCC moved the headquarters to the current location. As part of the successful lease negotiations, the agreement included a year and half of no lease payments. FY 2018 will be the first period in which MCC will incur rent costs for the full year.
  • Less expensive information technology (IT) architecture — In FY 2016, MCC migrated the agency’s IT infrastructure to a cloud service provider. This strategic move is anticipated to save the agency $6 million over the next 10 years and is being utilized to fund additional capital investments in software systems to automate core business processes, including some systems identified in MCC’s Agency Reform Plan.
  • System integrationMCC has transitioned to a new Contract Lifecycle Management System (CLMS) beginning in the first quarter of FY 2018. CLMS is integrated with the current financial management system, which MCC sources through the Department of Interior, and shortens the amount of employee time taken on procurement actions as well as improving data accuracy. This new system is anticipated to save the agency $2 million over the next 10 years in comparison to purchasing a standalone system.
  • Best-in-class solutionsMCC has identified projected spending of approximately $16.7 million in FY 2017 that utilizes existing contract solutions via federal supply schedules, government-wide acquisition contracts, and multi-agency contracts and procurement instruments. This is roughly 40 percent of non-human capital/rent spending, and is an example of MCC’s strategic effort to leverage the vast buying power of the federal government to deliver maximum value on our limited resources. MCC will continue to review current operations and new initiatives, optimizing the use of best-in-class solutions when applicable.

In addition to these past initiatives, MCC continues to focus on improving its efficiency and effectiveness to increase productivity. Below are several current initiatives included in MCC’s Agency Reform Plan and MCC’s Plan to Maximize Employee Performance, which the agency anticipates continuing into FY 2019:

  • Knowledge ManagementMCC is undertaking a knowledge management initiative to better capture and use accumulated knowledge to develop and implement country programs more efficiently and for greater impact. In addition, this initiative will allow the agency to strengthen program quality and impact, expedite problem solving through efficient access to needed knowledge, enhance onboarding practices, and institutionalize agency learning. In FY 2017, MCC focused on defining critical organizational needs and assessing existing vs. needed knowledge assets. Most recently, MCC began implementation of a knowledge management action plan, including staff-driven near-term priorities/work streams, IT infrastructure and processes to drive behavioral changes.
  • Star Reports — In FY 2017, MCC launched the Star Report to better communicate the full spectrum of results for a given program at its conclusion. The business process of the Star Report ensures MCC will collect, validate, and memorialize critical information for every compact and threshold program at key decisional points in program development and at each quarter of implementation, while also decreasing overall internal reporting burdens. Star Reports and their associated comprehensive data will provide contextualized results and program learning for both internal and external audiences.
  • Streamlining Compact Development — In Q4 of FY 2017, MCC launched a “challenge” calling on staff to submit ideas for decreasing the average 36 months it takes for compact development while maintaining the high quality that comes with MCC’s investments. Twenty-six teams provided diverse, creative solutions aimed to address time savings, feasibility, and adherence to MCC’s values. Selected ideas will be implemented in in FY 2018.
  • Workforce and Learning Management SystemsMCC will implement a system to integrate the agency’s systems and processes in tracking, identifying and documenting the lifecycle of an employee or contractor. In addition, this system will aim to inform strategic staffing decisions and ensure human capital resources are consistently directed to the highest-priority needs. MCC currently employs multiple systems, processes and staff to complete this process, which is disjointed and requires significant manual entry of data. MCC will also implement a learning management system, a shared, cloud-based system for integrated learning management, including external training. The current processing system is costly and inefficient and does not provide the data required for robust talent development practices and information-driven decision-making. Projected cost savings are estimated to be approximately $100,000 per year in staff time and effort.
  • Organizational Development Assessment and Workforce Demand ModelMCC will undertake an objective assessment of its organizational structure, operational roles and responsibilities, position structures, and workloads. The Organizational Development Assessment (ODA) will allow MCC to determine whether the organizational structure is optimized to fulfill MCC’s mission with the fewest management layers needed for appropriate risk management and accountability. ODA efforts are designed to maximize returns on organizational reform, increase organizational health, increase retention of top performing staff, and improve operational effectiveness/efficiency. MCC will also pilot new workforce planning tools that will allow MCC to better tie workforce decisions to business needs. This will enable the agency to better anticipate recruitment and staffing needs, avoid disruptive vacancies, and inform appropriate hiring authorities for positions.
  • Performance Management System — To maximize employee performance and accountability, MCC implemented a new performance management system in FY 2017 to improve performance target setting, evaluation, feedback, and consequence management. As a complement to this effort, in FY 2018 MCC plans to roll out a new rewards and recognition strategy to improve the transparency, timeliness, and perceived equity of the performance management process.

These efforts, together with others outlined in MCC’s Agency Reform Plan and Plan to Maximize Employee Performance, position MCC in alignment with the Administration’s priority to ensure the Federal Government is operating most efficiently and effectively.

And these efforts are already producing results, with MCC seeing the largest gains among all federal agencies for which data is available in the Partnership for Public Service’s 2017 Best Places to Work in the Federal Government rankings — a jump of 13.8 points.

Human Capital

MCC is planning $55 million for personnel expenditures to properly oversee and manage MCC’s programs. In FY 2019, MCC’s country portfolio is projected to include 16 countries in compact and threshold program implementation, ten countries in compact and threshold program development, and five countries undergoing initial post-closure evaluations. Such a portfolio with varying complexities, risks, and investment sizes requires stable cross-functional country teams applying rigor for establishing strong country-partner relationships, instilling country ownership, and ensuring program sustainability. MCC strives to maintain a steady state of human capital in support of these efforts, matching personnel skills and experience to the needs and risks of MCC’s investment portfolio by reviewing human capital and contracted services [full-time equivalent (FTE), personal service contractors, and service contractors] to ensure maximum efficiency and effectiveness based on workload support. As such, MCC continuously optimizes staff skillsets by utilizing a resource on more than one country program to achieve economies of scale.

To highlight one key set of human capital requirements, MCC’s authorizing statute requires MCC to develop compacts with partner countries that include specific objectives and benchmarks for measuring progress and to report annually on progress toward those objectives. Answering these questions requires monitoring and evaluations of MCC investments. MCC is committed to making its evaluations rigorous and feasible in order to understand the causal effects of its programs on expected outcomes, to assess the cost effectiveness of its interventions, and to inform decisions about current and future program design and implementation. The number of compacts and threshold programs that require monitoring and evaluation (M&E) increases each year, as more countries are selected compared to the number of countries for which MCC finalizes all evaluations. MCC’s M&E staff work on a compact and threshold program throughout its entire lifecycle (development, implementation, closeout, and post-compact evaluation) to create M&E plans, monitor program performance, and evaluate program effectiveness. In addition, compacts and threshold programs with lower-capacity countries and those with significant policy and institutional reforms require substantial MCC staff assistance with project identification, program logic, data collection, and implementation support.

In alignment with FY 2018 OMB guidance, MCC also aims to reduce the agency’s planned workforce from 330 to 320 at the Washington D.C. headquarters in FY 2018 and FY 2019. When coupled with increased workforce optimization initiatives outlined here and in MCC’s Agency Reform Plan, this staffing level will enable MCC to continue meeting the agency mission based on anticipated compacts and threshold programs in development and implementation. In FY 2018, MCC will establish a systematic workforce planning process to inform strategic staffing decisions for mission critical positions. The process will be supported by parallel work streams. The first work stream on centralized FTE management, is driven by hiring to attrition and controls the growth of the existing workforce through a rigorous vacancy review, prioritization, and approval process. The second work stream on organizational development assessment, aims to ensure MCC’s positions and organizational structure are aligned to deliver high-quality, timely, and effective compact and threshold programs. Through the assessment, MCC will review position descriptions for mission critical occupations and compare that information against work performed. Additionally, MCC will assess whether the nature of the work is structured appropriately by reviewing, analyzing, and validating the data used to assess workload and analyzing it against data reported and captured within MCC’s financial system and human resources system.

Overseas Operations

MCC is planning $9 million to support overseas administrative operations in at least 20 compact and threshold countries in FY 2019. Overseas operations costs for each country include salaries and benefits, rent, residential allowance, relocation expenses, travel, shipping, office and residential furniture, IT equipment, official vehicles, and International Cooperative Administrative Support Services (ICASS) costs for a small in-country footprint of U.S. and locally-employed personnel. MCC may continue to face upward pressure associated with ICASS and Capital Security Cost-Sharing (CSCS) based on burden sharing and cost arrangements established by the Department of State to maintain and operate embassy compounds. As part of the IPBE implementation, MCC reviewed previous funding allotted to the Department of State in support of overseas operations and has included a budget to match past disbursement trends in order to maximize the use of funding while providing adequate support towards our relatively small overseas presence.

Information Technology (IT)

MCC is planning $15 million for information and technology (IT) support in FY 2019.

MCC’s Office of the Chief Information Officer (OCIO) has actively worked to leverage new technologies and to automate IT processes to reduce costs and improve productivity on its operational teams without degrading service quality or increasing cybersecurity risks. These initiatives include:

  • The FY 2016 migration of IT servers from a co-located data center to a cloud service provider remains on track to save the agency $6 million over 10 years.
  • MCC will be consolidating two, large IT service contracts for production infrastructure operations and help-desk end-user support. Today, these two contracts cost MCC approximately $6 million annually—a consolidated contract will reduce administrative overhead and increase efficiencies to result in significant savings in FY 2019 and beyond.
  • OCIO has worked with departments across MCC to reduce the number of software packages supported, where possible, in order to increase standardization with tools included within the Microsoft’s Office 365 productivity suite.
  • The automation of critical cybersecurity processes, e.g., software patch management, will reduce contractor hours spent on this currently labor-intensive requirement.

Cost savings resulting from these four initiatives will reduce the overall percentage of agency funds spent on IT, while also providing funds for specific capital investments to increase staff productivity and modernize MCC operations, including:

  • increased modern, cloud-based platforms for staff collaboration and knowledge management;
  • a solution for more effective workforce management for employees and contractors;
  • streamlined processes for Millennium Challenge Account (MCA) reporting and overall grant management for country teams;
  • more effective customer relationship management tools for greater private-sector engagement on compacts; and
  • improved analytical tools for impact assessment and open data publishing outside of MCC.

Rent

MCC will be responsible for a full-year rent obligation of $6 million at the current headquarters location beginning in FY 2018 and onward. As part of moving to the headquarters location, MCC took the proactive approach of reducing the agency footprint and increasing collaboration by using intelligent workspaces. As such, MCC is piloting a workspace management application called SPACES, a private-sector approach to more nimbly manage on-demand seating, conference room and breakout spaces, capitalizing on the best use of MCC’s headquarters office footprint.

Office of the Inspector General

(in millions of $) FY 2017 Enacted FY 2018 CR Rate Annualized FY 2019 Request
Total Appropriation/Request 905.0 898.9 800.0
  Office of the Inspector General 5.0 4.5 4.5

The Office of the Inspector General is requesting $4.5 million for audit expenses in FY 2019.

The USAID Office of the Inspector General will continue to conduct financial and performance audits and reviews of MCC and Millennium Challenge Account entity activities, as well as oversee and review MCC’s annual external audit.

Proposed Legislative Changes

Using Concurrent MCC Compacts to Advance Regional Economic Integration

MCC is seeking to change the Millennium Challenge Act of 2003, as amended, to allow for concurrent compact authority in order to maximize the economic impact of its work through regional investments. After more than 13 years of successfully delivering large, complex infrastructure projects coupled with supporting difficult policy reforms in partner countries, MCC is well-positioned to increase the impact of its programs by focusing regionally in some cases.

Concurrent compacts would allow MCC to complement its proven country-focused model with the ability to develop regionally-oriented programs. MCC will be able to simultaneously research and work with multiple eligible countries in a region to identify, negotiate, and eventually fund compacts that would have a positive economic impact for each country involved as well as the region. By coordinating compacts across multiple countries to expand existing infrastructure, MCC will be able to help partners work together to build and grow regional markets, facilitate trade, and foster greater impact through economies of scale. This, in turn, will help generate new business and market opportunities for U.S. and other companies by making it cheaper, easier, and faster for businesses to get their products to new, emerging regional markets.

At present, MCC has the authority to sign and implement only one compact at a time with any given partner country. As a result, MCC cannot effectively move forward on multi-country programs to advance regional economic integration. This is especially true in places where MCC is heavily engaged, such as Africa, and in sectors such as infrastructure, which accounts for 70 percent of MCC’s more than $11 billion dollar portfolio. For instance, in December 2015, MCC selected Côte d’Ivoire as eligible to develop a compact. Several existing MCC compact partners are neighbors of Côte d’Ivoire, including Burkina Faso, Ghana, and Liberia. The ability to sign concurrent compacts would enable MCC to improve trade and investment between and among these MCC partner countries by promoting cross-border engagement, and thereby economic growth.

The authority MCC is seeking would allow the agency to maintain its focused, data-driven model for country and project selection. Projects will still be required to undergo a rigorous economic analysis and have an economic rate of return that ensures the program’s logic is geared toward a measurable impact on poverty. Regional programs will employ MCC’s local implementation and accountability, allowing for multiple bilateral compacts to be knitted together into a regional project. Concurrent compact authority will allow MCC to develop regional projects while still adhering to the agency’s important country-owned processes that demand accountability and the core elements of MCC’s operational model to produce high returns on investments. In any regional program, MCC would continue its:

  • Transparent process for selecting the best-governed, poor countries. Selection of regional programs would be based upon the existing country selection system; countries selected by the Board as eligible for bilateral compacts would also be eligible for regional programs.
  • Use of economic analysis to choose projects. Regional projects would be selected based on economic analysis of project returns. The preliminary economic rates of return (ERRs) will need to show returns above MCC’s hurdle rate, five-year timeline feasibility, manageable environmental and social risks, implementation of policy and institutional reforms, private sector engagement, and sustainability.
  • Commitment to suspend or terminate investments when appropriate. MCC recognizes that one of the risks inherent in regional projects is that one or more of the countries involved in the partnership may not perform well or may suffer governance declines inconsistent with continued MCC engagement. MCC is committed to suspend or terminate regional programs as appropriate,consistent with bilateral programs.

The text of the proposed statutory change is as follows:

SEC. X. MILLENNIUM CHALLENGE COMPACT

  1. IN GENERAL.—Section 609 of the Millennium Challenge Act of 2003 (22 U.S.C. 7708) is amended—
    1. in subsection (k), by striking the first sentence;
    2. by redesignating subsection (k) as subsection (l); and
    3. by inserting after subsection (j) the following:
      “(k) CONCURRENT COMPACTS.—An eligible country that has entered into and has in effect a Compact under this section may enter into and have in effect at the same time not more than one additional Compact in accordance with the requirements under this title if-

      1. one or both of the Compacts are or will be for the purposes of regional economic integration, increased regional trade, or cross-border collaborations; and
      2. the Board determines that the country is making considerable and demonstrable progress in implementing the terms of the existing Compact and supplementary agreements thereto.”.
  2. CONFORMING AMENDMENT.—Section 613(b)(2)(a) of such Act (22 U.S.C. 7712(b)(2)(A)) is amended by striking “the” before “Compact” and inserting “any”.
  3. APPLICABILITY.—The amendments made by this section shall apply with respect to Compacts entered into between the United States and an eligible country under the Millennium Challenge Act of 2003 before, on, or after the date of the enactment of this Act.

Appendix: Annual Performance Report

Compact Signing Amounts and Key Dates (in millions of $)*

Partner Country Compact Amount Signing Entry Into Force Closed Dates
Madagascar 109.8 4/18/2005 7/27/2005 8/31/2009
Honduras 215.0 6/14/2005 9/30/2005 9/30/2010
Cabo Verde 110.1 7/5/2005 10/18/2005 10/17/2010
Nicaragua 175.0 7/15/2005 5/26/2006 5/26/2011
Georgia 395.3 9/12/2005 4/7/2006 4/7/2011
Benin 307.3 2/22/2006 10/6/2006 10/6/2011
Vanuatu 65.7 3/2/2006 4/28/2006 4/28/2011
Armenia 235.7 3/27/2006 9/29/2006 9/29/2011
Ghana 547.0 8/1/2006 2/16/2007 2/16/2012
Mali 460.8 11/13/2006 9/18/2007 8/24/2012
El Salvador 460.9 11/29/2006 9/20/2007 9/20/2012
Mozambique 506.9 7/13/2007 9/22/2008 9/22/2013
Lesotho 362.6 7/23/2007 9/17/2008 9/17/2013
Morocco 697.5 8/31/2007 9/15/2008 9/15/2013
Mongolia 284.9 10/22/2007 9/17/2008 9/17/2013
Tanzania 698.1 2/17/2008 9/17/2008 9/17/2013
Burkina Faso 480.9 7/14/2008 7/31/2009 7/31/2014
Namibia 304.5 7/28/2008 9/16/2009 9/16/2014
Senegal 540.0 9/16/2009 9/23/2010 9/23/2015
Moldova 262.0 1/22/2010 9/1/2010 9/1/2015
Philippines 433.9 9/23/2010 05/25/11 5/25/2016
Jordan 275.1 10/25/2010 12/13/11 12/13/2016
Malawi 350.7 4/7/2011 9/20/2013
Indonesia 600.0 11/19/2011 4/2/2013
Cabo Verde, 2012 66.2 2/10/2012 11/30/2012 11/30/2017
Zambia 354.8 5/10/2012 11/15/2013
Georgia, 2013 140.0 7/26/2013 7/1/2014
Ghana, 2014 498.2 8/5/2014 9/6/2016
El Salvador, 2014 277.0 9/30/2014 9/9/2015
Benin, 2015 375.0 9/9/2015 6/22/2017
Liberia 256.7 10/2/2015 1/20/2016
Morocco, 2015 450.0 11/30/2015 6/30/2017
Niger 437.0 7/29/2016
Nepal 500.0 9/14/2017
Côte d’Ivoire 524.7 11/7/2017

* Please note that the values above are the signed compact amounts and do not reflect lower actual expenditures due to early terminations or funds for a compact not being fully spent. The table on the next page reflects the net obligations/commitments associated with each compact.

Compact Obligations and Commitments

Country/Description 2012 & Prior 2013 2014 2015 2016 2017 2018 2019 Total
Closed Compacts $7,402.6 $7,402.6
Cabo Verde 66.2 66.2
El Salvador 117.0 160.0 277.0
Georgia 140.0 140.0
Ghana 17.0 283.0 198.2 498.2
Indonesia 600.0 600.0
Liberia 256.7 256.7
Malawi 350.7 350.7
Niger 58.0 379.0 437.0
Zambia 354.8 354.8
Benin 207.0 168.0 375.0
Morocco 114.1 1.2 168.7 166.0 450.0
Nepal 108.0 10.0 69.0  107.0  206.0 500.0
Côte d’Ivoire 40.5 9.0 272.0 10.0 26.2 167.0 524.7
Active Compacts $1,966.3 $670.2 $638.9 $669.7 $512.3 $373.0 $4,830.3
Mongolia 99.9 8.3 143.1 98.7 350.0
Senegal 81.6 44.4 3.4 18.7 180.4  178.0 506.5
Burkina Faso 4.0 300.0 304.0
Sri Lanka 343.0 107.0 450.0
Tunisia 142.0 150.5 292.5
Lesotho
Sri Lanka
Compacts in Development $181.5 $44.4 $11.7 $161.8 $279.1 $667.0 $557.5  $1,903.0
TOTAL  $9,550.4 $670.2 $683.3 $681.4 $674.1 $652.1  $667.0 $557.5  $14,135.9

Threshold Program Agreements Signing Amounts (in millions of $)

Country Sub-Saharan Africa Eurasia Latin America Middle East and North Africa Signing Date Completion Date
Burkina Faso 12.9 7/22/2005 9/30/2008
Malawi 20.9 9/23/2005 9/30/2008
Albania, 2006 13.9 4/3/2006 11/15/2008
Tanzania 11.2 5/3/2006 12/30/2008
Paraguay, 2006 34.6 5/8/2006 8/31/2009
Zambia 22.7 5/22/2006 2/28/2009
Philippines 20.7 7/26/2006 5/29/2009
Jordan 25.0 10/17/2006 8/29/2009
Indonesia 55.0 11/17/2006 12/31/2010
Ukraine 44.5 12/4/2006 12/31/2009
Moldova 24.7 12/14/2006 2/28/2010
Kenya 12.7 3/23/2007 12/31/2010
Uganda 10.4 3/29/2007 12/31/2009
Guyana 6.7 8/23/2007 2/23/2010
São Tomé & Principe 8.7 11/9/2007 4/15/2011
Kyrgyz Republic 16.0 3/14/2008 6/30/2010
Niger 23.1 3/17/2008 12/31/2015
Peru 35.6 6/9/2008 9/30/2012
Rwanda 24.7 9/24/2008 12/31/2011
Albania, 2008 15.7 9/29/2008 7/31/2011
Paraguay, 2009 30.3 4/13/2009 7/31/2012
Liberia 15.1 7/6/2010 12/1/2013
Timor-Leste 10.5 9/22/2010 3/31/2014
Honduras 15.6 8/29/2013 In progress
Guatemala 28.0 4/8/2015 In progress
Sierra Leone 44.4 11/17/2015 In progress
Kosovo 49.0 9/12/2017 In progress

Results of Recently Closed Compacts

Cabo Verde II

Policy Refoms
  • Environmental requirements, including an improved regime for the disposal of sludge according to international standards. The Ministry of Water and Irrigation will soon float a tender for the construction of the first mono landfill for the disposal of sludge and bio solids and for electricity generation.
Outputs Land Management for Investment Project

  • 11,418 households, commercial and other legal entities received formal recognition of ownership and/or use rights.
  • 28,985 parcels were corrected or incorporated into an official land information system.
  • 100% of targeted surfaced area on Sal Island has been incorporated into the Land Management Information and Transaction System (LMITS).
  • 38 land administration offices were established or upgraded.

Water, Sanitation and Hygiene Project

  • In partnership with the Coca-Cola Africa Foundation, the Social Access Fund increased access to water and sanitation with over 3,500 households receiving subsidized water connections and more than 2,200 households benefiting from new sanitation facilities.
  • Construction of over 200 km of water pipeline and over 20 km of sanitation pipeline.
  • More than 60 reservoirs and pumping stations constructed or rehabilitated.
Preliminary and Expected Outcomes 1
  • The infrastructure improvements of the Water and Sanitation Fund supported utilities to improve or expand or improve their water and sanitation networks.
  • On Santiago Island, transformation of the water sector, including establishment of a new corporatized, consolidated utility—Aguas de Santiago, with more efficient and effective operations and management— has resulted in more than doubling the number of hours of water service many residents on the island receive per day, which has increased from about 6 hours to over 14 hours per day.
  • The Compact introduced an infrastructure grant facility to fund infrastructure works in the WASH sector. This innovative funding mechanism has inspired the Government of Cabo Verde to create a revolving fund to continue to fund the sector.
Evaluations Land Management for Investment Project

  • An independent evaluator is implementing a mixed methods performance evaluation to assess the impacts of LMI Project on investment in land and property, property values, land tenure security, time to process key land transactions, demand for formal land transactions, and tourism growth, as well as sustainability of the new systems and procedures introduced by the Project.
  • The evaluation includes three complementary components: a trend analysis examining changes in key outcomes over time using secondary data, a qualitative study collecting two rounds of in-depth interviews and focus groups with households and businesses to help interpret the findings from the trend analysis, and a multisite case study of large tourism related commercial investments to capture planned and actual investments in tourism development zones (known as  Zonas de Desenvolvimento Turístico Integral, or ZDTIs) to understand how the project affected these investments.
  • Given the concerns around women’s land rights, the evaluation will also include an analysis of how women’s land rights were captured in the clarification of rights and boundaries process and whether women and men benefit differently.
  • In support of the monitoring and evaluation, LMI stakeholders are collecting detailed land administrative data across multiple land and investment offices regarding key land transactions (sales, greenfield investments, mortgages and building permits) to better understand how the new Land Management and Information Transaction System (LMITs) and related clarification of rights and boundaries affects time to process a land transaction, demand for land services and related land markets.
  • The evaluation is anticipated to be completed in 2020 after a 3-year exposure period, with a final report in 2021.

Water, Sanitation and Hygiene Project

  • MCC has contracted an independent evaluator to (1) document how the project activities were implemented along with key outcomes of those activities; (2) track changes in outcomes among households who received subsidized connections to the water network on Santiago through the Social Access Funds; (3) assess utility-level outcomes that are expected to be affected by the WASH project activities; and (4) evaluate how FASA funding might have incentivized utilities to corporatize, how households and utilities are affected by the infrastructure, and consider the prospects for the infrastructure to be sustainably managed. The evaluation is scheduled to complete an interim report in fall 2018 and a final report to be submitted in 2022.

Compact Modifications

MCC employs a risk-based approach to the management of its portfolio and uses a number of mechanisms to manage projects that face potential major modifications, including the following:

  • Quarterly portfolio reviews of all compacts, with a focus on high-risk projects and activities;
  • Early identification of high-risk projects;
  • Close collaboration with partner countries to develop plans to prevent, mitigate and manage project restructuring; and
  • Approval of modifications at the appropriate level.

MCC also conducts due diligence on programs in advance of compact signing to increase the reliability of technical, cost, and other estimates. During compact development, MCC makes project design modifications to mitigate potential completion risk, currency fluctuations and the potential for construction cost ovERRuns.

Summary of Restructurings and Reallocations in FY 2016
Project/Activity Programmatic Change Description
Indonesia Green Prosperity Project / Green Prosperity Facility Activity ($242 million) Reallocation of $12 million of funding from the Green Prosperity Facility to Technical Assistance and Oversight During finalization of the Green Prosperity (GP) Facility portfolio in mid-2016, MCA-Indonesia identified budget shortfalls for technical assistance and oversight. The funds are needed for program administration, oversight, and identification of new initiatives to mitigate implementation risks and improve project sustainability. Such support will help improve the chances of successful implementation of the project grants, and aid in the delivery of GP grant outputs.
Indonesia (Cont.) Procurement Modernization Project Reallocation of $7.7 million from the Program Administration and Control Activity to the Procurement Modernization Project’s Procurement Professionalization Activity The reallocation of funds was designed to help ensure project sustainability by including additional workshops, which would help expand socialization of key concepts, develop a competency-based professional certification program, and improve project investments under implementation. Moreover, MCA-Indonesia’s assessment showed that logistics costs for the project exceeded estimates, and additional support was needed to continue human resources development training with the projected beneficiaries to ensure program sustainability.
Indonesia (Cont.) Procurement Modernization Project Reallocation of $2.2 million from the Program Administration and Control Activity to the Procurement Modernization Project’s Policy and Procedure Development Activity The objectives of the Public Private Partnership (PPP) Sub-Activity are to develop Policies and Procedures on PPP Procurement, and Bidding Documents to facilitate the implementation of PPP procurement across a diverse set of economic and social sectors. Piloting of these projects requires identification and close cooperation between MCA-Indonesia and the Government of Indonesia as well as the selected PPP proponents. After evaluating the quality of existing pre-feasibility studies for the selected pilots, it became clear that the additional funds are needed to refine the existing studies in order for the PPP Sub-Activity to advance with the bidding documentation and the actual piloting of the new procurement policies and procedures.
Ghana Northern Electric Distribution Company (NEDCO) Financial and Operational Turnaround Project Approval by MCC management of a redesigned NEDCO Financial and Operational Turnaround Project in the amount of $54.2 million MCA-Ghana worked with MCC‘s Ghana country team to redesign the NEDCO project. The redesign, which was completed at the end of 2016, resulted in several material changes to the following activities: the Private Sector Participation Activity, the Modernizing Utility Operations Activity, the Tamale Service Area Improvement Activity, and the Commercial Development Activity. The redesigned project passes the 10 percent economic rate of return hurdle and was approved by MCC senior management in January 2017.
Zambia Infrastructure Activity Additional $22 million to be provided by the Government of the Republic of Zambia to support the completion of the Infrastructure Activity as originally planned During program implementation, it became clear that the cost to complete the Infrastructure Activity had increased due to unforeseen circumstances, including: Massive underground rock formations not detected during preparatory works; Change in the number of “Project Affected Persons” (persons losing assets because of the project who must compensated) and increased in-kind replacement of structures built in project corridors leading to increased resettlement costs; Underground utility relocations that had not been geo-referenced by utility companies that must be moved during construction works at a cost; Alignment of the detailed designs to adjust to changed circumstances in order to avoid high value impacts, and Increased costs associated with construction of the Bombay Drain. To mitigate this risk, the Zambians committed to contribute $22 million in 2017.

Estimating Compact Beneficiaries and Benefits

Under MCC‘s results framework, beneficiaries are defined as an individual and all members of his or her household who will experience an income gain as a result of MCC interventions. We consider that the entire household will benefit from the income gain and counts are multiplied by the average household size in the area or country. The beneficiary standard makes a distinction between individuals participating in a project and individuals expected to increase their income as a result of the project. Before signing a compact, MCC estimates the expected long-term income gains through a rigorous benefit-cost analysis. MCC may reassess and modify its beneficiary estimates and the present value of benefits when project designs change during implementation.

Compact 2 3 Estimated Number of Beneficiaries Estimated Long Term Income Gain Over the Life of the Project (PV of Benefits) 4
Armenia 428,000 $295,500,000
Benin 14,059,000 $409,600,000
Benin II 9,926,000 $320,500,000
Burkina Faso 1,181,000 $151,000,000
Cape Verde I 385,000 $149,300,000
Cape Verde II 604,000 $112,900,000
El Salvador 706,000 $377,800,000
El Salvador II 6,446,000 $224,500,000
Georgia 143,000 $301,300,000
Georgia II 1,770,000 $338,000,000
Ghana 1,217,000 $733,100,000
Honduras 1,705,000 $237,300,000
Indonesia 5 1,700,000 $217,000,000
Jordan 3,000,000 $398,900,000
Lesotho 1,041,000 $485,000,000
Liberia 564,000 $353,900,000
Madagascar 480,000 $123,200,000
Malawi 983,000 $567,200,000
Mali 2,837,000 $393,600,000
Moldova 414,000 $206,100,000
Mongolia 2,058,000 $314,800,000
Morocco 1,695,000 $805,400,000
Mozambique 2,685,000 $288,900,000
Namibia 1,063,000 $310,400,000
Nicaragua 119,000 $83,500,000
Philippines 125,822,000 $464,400,000
Senegal 1,550,000 $625,000,000
Tanzania 5,425,000 $1,474,000,000
Vanuatu 39,000 $73,800,000
Zambia 1,200,000 $306,600,000
Total for All Compacts 6 191,244,000 $11,142,500,000

Post Compact Economic Rates of Return

All MCC projects are independently evaluated, and these independent evaluations often include post compact ERRs. Independently calculated ERRs complement the closeout ERRs that MCC calculates at the end of the compact. Because independent evaluations occur 2-5 years after compact closure, independently calculated ERRs can offer an updated assessment of a project’s costs and benefits post-compact. However, these ERRs are still projections for projects whose benefits are often projected to last up to 20 years. Nonetheless, the independently produced post compact ERRs, which are based upon the best available evidence, complete the accountability loop in a way that is rare among donors. Two examples are below.

Results of the Mozambique Farmer Income Support Project

MCC’s Farmer Income Support Project (FISP) was designed to reduce the damage to the incomes of 1.7 million Mozambican farmers due to Coconut Lethal Yellowing Disease (CLYD).  This was to be accomplished through (i) short term surveillance, control, and mitigation services, prompt eradication of diseased palms, and replanting with the less susceptible Mozambican Green Tall coconut variety, and (ii) Technical advisory services to introduce crop-diversification options.  Given projected benefits to farmers’ incomes and the costs of the program, MCC originally projected the project to have an economic rate of return of 25.1 percent.

An independent evaluation of the FISP project’s impacts found that cutting trees and burning tree stumps in epidemic areas did reduce CLYD prevalence, but not to the degree originally forecast, resulting in lower than expected productivity impacts. Likewise, endemic area alternative crop uptake was lower than expected, likely due to insufficient input and output market linkages. The resulting updated, ex-post ERR estimate was 16.8 percent.  Greater detail on the evaluation and lessons learned are available in MCC’s public evaluation catalogue. 7

Results of the Nicaragua Transportation Project

MCC’s Nicaragua Transportation Project was designed to stimulate economic development and improve access to markets and social services by reducing transportation costs.  It upgraded and rehabilitated 68 km of roads, consisting of two secondary roads and a trunk road.  MCC’s originally estimated an economic return from the project of 13.2 percent based on reduced vehicle operating costs and travel time savings for road users, including those who would travel on the road due to improved road conditions resulting from the project.

The independent evaluation of this project estimated actual impacts using data from 2 years after the roads were completed.  It found that the road roughness, a key indicator of transport costs, decreased 80 percent on average, and traffic increased 12 percent on average over the 2 years to 3,062 vehicles per day.  At the same time, the capital costs for the road works came in on average 2.2 times those estimated prior to implementation.  Given this balance of measured benefits and costs, the resulting “ex-post” ERR fell to 2.1 percent, primarily due to these higher costs.  (Benefits were roughly consistent with ex-ante estimates.) Greater detail on the evaluation and lessons learned are available in MCC’s public evaluation catalogue, 8 and recently published Principles into Practice: Lessons from MCC’s Investments in Roads. 9

Portfolio by Sector

Investments by Sector

Sector Amount ($ Millions)
Transportation (Road, Water & Air) $3,044.4
Agriculture $1,963.6
Energy $1,889.3
Health, Education & Community Services $1,662.8
Program Administration & Monitoring $1,248.3
Water Supply & Sanitation $1,088.8
Governance $649.2
Financial Services $159.8
Total $11,706.2

Results by Sector as of FY 2017 Q4

Sector Indicator Total Portfolio Actuals (cumulative value 2005-present) Data Points (number of compacts) Active and Completed Countries Tracked (underlined indicates still active)
Roads Temporary employment generated in road construction 49,822 6 Armenia, Burkina Faso, Cabo Verde, El Salvador, El Salvador II, Georgia, Ghana, Honduras, Liberia, Mali, Moldova, Mongolia, Mozambique, Nicaragua, Philippines, Senegal, Tanzania, Vanuatu
Kilometers of roads completed 3,035 15
Agriculture & Irrigation Farmers trained 330,814 14 Armenia, Burkina Faso, Cabo Verde, El Salvador, Georgia, Ghana, Honduras, Indonesia, Madagascar, Mali, Moldova, Morocco, Mozambique, Namibia, Nicaragua, Senegal
Farmers who have applied improved practices as a result of training 126,592 10
Hectares under improved irrigation 203,963 8
Value of agricultural and rural loans $87,074,694 9
Water & Sanitation Temporary employment generated in water and sanitation construction 21,459 6 Cabo Verde II, El Salvador, Georgia, Ghana, Jordan, Lesotho, Mozambique, Tanzania, Zambia
People trained in hygiene and sanitary best practices 12,135 6
Water points constructed 1,181 3
Operating cost coverage 93% 4
Access to improved water supply 63% 3
Education Students participating 215,607 7 Burkina Faso, El Salvador, El Salvador II, Georgia II, Ghana, Mongolia, Morocco, Namibia
Facilities completed 772 6
Graduates from MCC-supported education activities 62,211 5
Land Legal and regulatory reforms adopted 127 7 Benin, Burkina Faso, Cabo Verde II, Ghana, Indonesia, Lesotho, Madagascar, Mali, Mongolia, Mozambique, Namibia, Nicaragua, Senegal
Stakeholders trained 76,531 11
Land administration offices established or upgraded 399 8
Parcels corrected or incorporated in land system 338,393 8
Land rights formalized 321,508 7
Power Kilometers of lines completed 4,318 4 El Salvador, Georgia, Ghana, Ghana II, Indonesia, Liberia, Malawi, Mongolia, Tanzania

Sector Results at a Glance

Numbers are cumulative since the agency’s founding in 2004 and current as of September 2017.

Once a country is selected as eligible to develop a compact or threshold program, the first step in MCC’s process is to work with partner country officials to conduct a rigorous, joint analysis that identifies the most binding constraints to economic growth. These results help prioritize MCC’s investments in the areas that are the biggest impediments to private investment and poverty reduction and may include access to credit, governance, electricity, transportation, or education. Constraints to growth are different for each country and ultimately drive MCC’s investment strategy. Below are highlights of MCC’s sector investments that have emerged from this analysis.

Power

2,683 miles of electricity lines completed
MCC is making major investments in the energy sector to reduce energy poverty in Nepal, Benin, Ghana, Liberia, Malawi and Sierra Leone, while encouraging power sector reforms that complement infrastructure investments. In Liberia, MCC’s compact funds the rehabilitation of a hydropower facility to increase the amount of generated electricity, facilitate lower overall electricity rates, and increase the reliability and adequacy of electricity. In Ghana, the government took significant steps to revitalize its power sector by inviting the private sector to invest in one of its national distribution utility.  Implementation of the compact with Benin continues while significant construction works for large-scale, on-grid generation, transmission and distribution projects are underway in Malawi, as well as smaller-scale, on- and off-grid energy projects in Indonesia. In Sierra Leone, MCC began carrying out its threshold program to build the capacity of the newly established power regulator and power generation and transmission utility.  In Nepal, preparations are underway for the design of the transmission line funded under the compact.  In addition, Kosovo’s threshold program will strengthen the power sector by fostering a market-driven approach to lowering energy costs for households and business, and developing new sources of electricity generation.

Transportation

2,500 miles of road completed
1,000 additional miles of roadway under construction

In May 2016, the Philippines, using MCC compact funding, successfully completed the reconstruction/rehabilitation of 137.9 miles of a road in the Samar and Eastern Samar provinces of the country that will help lower transport costs and travel time and opens up possibilities for new markets. For the Niger Compact, investments were prepared for the upgrading of approximately 198 miles of roads to international standards, and enhancement of both national and regional connectivity. Implementation of technical assistance and policy reform activities that would set Liberia on a long-term path to a sustainable road maintenance were started.  In Nepal, a comprehensive technical assistance program targeting capacity building in road maintenance planning and construction has been launched and includes plans to conduct the periodic maintenance of approximately 300km of roads.  In Cote D’Ivoire, the design of major rehabilitation and upgrading of four (4) major urban corridors in the metropolitan area of Abidjan has been launched.  In El Salvador, the construction tender for a capacity upgrading of the heavily trafficked segment of 18 miles of coastal highway has been completed and construction is scheduled to start in early winter 2018.

Water and Sanitation

12,135 people trained in hygiene and sanitary best practices
1,181 water points constructed

MCC supports capital improvements and policy and institutional reforms to improve the level and quality of water and sanitation services in partner countries. MCC’s five year compact with Jordan, for example, closed in FY 2016 after investing more than $200 million for rehabilitation and construction of water supply and wastewater infrastructure including investment in the As-Samra wastewater treatment plant where treated effluent will be diverted for agricultural use saving precious bulk water supply for this water poor nation. MCC’s compact investment in Zambia is strengthening the main water utility company to improve billings and collections and provide more reliable service to its customers. In Sierra Leone, MCC is partnering with the government on a threshold program to implement policy reforms, build institutional capacity and improve governance in the water sector in Freetown. A comprehensive assessment of the water utility in Guma Valley was conducted to determine the priority areas of assistance for strengthening utility performance but because a cost-benefit analysis is not required for threshold program assistance, the estimated number of beneficiaries above does not include the Sierra Leone beneficiaries.

Agriculture and Irrigation

330,814 farmers trained
504,004 acres (203,963 hectares) under improved irrigation
In July 2016, MCC signed a $437 million compact with Niger focused on strengthening the agricultural sector. Through the compact’s Irrigation and the Market Access Project, MCC will work with the Government of Niger to improve irrigation, including the rehabilitation and development of three large-scale irrigation systems in the Dosso and Tahoua regions, to increase crop yields, sustainable fishing and livestock productivity. In addition, the project will reform policies and institutions, including the establishment of a national water resource management plan and natural resource and land use management plans, and create local capacities to increase understanding of best-practices to sustainably use and maintain irrigation and market infrastructure.

Land

321,508 household, commercial, and legal entities gained protected land rights
MCC works with partner countries to improve land governance and administration, strengthen property rights, and stimulate private-sector investment for more productive land use. In Cabo Verde, MCC has invested to reduce the time required to register property rights and establish more conclusive land records in areas with high development potential. MCC funding was used under a pilot activity to complete surveys for 100 percent of land parcels on the island of Sal, which are now being registered. This activity led to the passage of a legal amendment in August 2016 that streamlined the land survey and registration process. MCC is now funding the survey and registration of an additional 22,824 parcels on the islands of Boa Vista, Maio, and Sao Vicente. In Indonesia, MCC’s investment in natural resource management and renewable energy includes development of a methodology for community-based participatory mapping of village boundaries and cultural and natural resources. Following this methodology, villages are able to produce legally recognized village maps to enhance land use plans. As of September 30, 2016, MCC funding had assisted 114 communities in defining and demarcating the boundaries of their villages. Land and natural resource information systems were being installed in government offices in 35 districts across 10 provinces to provide decision-makers with the information they need to encourage investment while effectively supporting the management of their land and other natural resources.

Education

772 education facilities constructed or rehabilitated
4,716 instructors trained
215,607 students participating in MCC-supported education activities

MCC works with partner countries to ensure that students obtain the knowledge and skills demanded by the private sector. In FY 2016, El Salvador officially announced its commitment to reform the technical and vocational education and training (TVET) system, identifying four transformative industries to target. The Salvadorians are establishing Skills Sector Committees for each of these four industries to define demand-driven training programs to feed into the overall technical and vocational educating training system. In Georgia, 26 schools have been completed, with another 3 on track to be completed by December 2017 and hundreds of students will be able to move into highly improved learning environments. Also in Georgia, more than 1,600 principals have been trained. The MCA-Georgia TVET Facility has awarded its first round of grants totaling approximately $12 million, slated to be disbursed in 2018. In September 2016, construction tenders were successfully launched for rehabilitation of pilot schools for MCC’s Morocco Compact. Also in Morocco, preparations are underway to field test an innovative Integrated School Improvement Model that will eventually be implemented in approximately 100 secondary schools, and planning advanced significantly for a TVET Grant Facility as well as a results-based financing component of the compact that aims to improve job placement for women and at-risk youth.  In Cote D’Ivoire, MCC signed a Compact with the government in November 2017.  The Compact includes an education project with investments in both secondary education and TVET.  The secondary education activity will increase access to and the quality of education for students, while the TVET activity will introduce a demand-driven model of skills development with private sector governance.  Further, the Guatemala threshold program now includes a TVET component.

Health

1,564 health providers trained on growth monitoring
6,857 service providers trained on community-led total sanitation triggering
16,797 service providers trained on infant and young child feeding

MCC works with partner countries to integrate sanitation, maternal and child health, and nutrition interventions to reduce stunting and increase household income. In Indonesia, MCC has committed more than $130 million to improve nutrition and health. MCC’s Indonesia Compact includes a partnership with the World Bank using incentives-based community grants to increase the demand for health, nutrition and education services and improves the health sector’s capacity to respond to increased demand at the facility and community level. In Sierra Leone, MCC has committed $5 million to improve access to reliable and safe water and sanitation (WASH) services, and to promote WASH practices at the household level. Increased access to safe drinking water, food, and sanitation services is critical to improving children’s nutritional status and preventing environmental enteropathy, which has been associated with growth failure in children.

Common Indicators

Agriculture and Irrigation (all common indicators data as of September 10, 2017)

Process Indicators Output Indicators Outcome Indicators
Country Region (AI-1)
Value of signed irrigation feasibility and design contracts (USD)
(AI-2)
Percent disbursed of irrigation feasibility and design contracts
(AI-3)
Value of signed irrigation construction contracts (USD)
(AI-4)
Percent disbursed of irrigation construction contracts
(AI-5) Temporary employment generated in irrigation (AI-6)
Farmers trained
(AI-7) Enterprises assisted (AI-8)
Hectares under improved irrigation
(AI-9)
Loan borrowers
(AI-10)
Value of agricultural and rural loans (USD)
(AI-11) Farmers who have applied improved practices as a result of training (AI-12) Hectares under improved practices as a result of training (AI-13) Enterprises that have applied improved techniques
MCC Total 51,925,328 87.3% 698,425,169 90.2% 6,908 330,814 4,223 203,963 1,195 87,074,694 126,592 42,226 1,016
EAPLA* Total 10,686,574 93.0% 190,892,731 88.1% 2,975 139,419 1,597 11,926 1,099 66,414,932 56,496 7,279 418
AFRICA Total 41,238,754 85.8% 507,532,438 90.9% 3,933 191,395 2,626 192,037 96 20,659,762 70,096 34,947 598
Armenia EAPLA 4,601,073 100.0% 106,653,443 100.0% 2,389 45,639 227 1,008 13,133,200 26,424 178
El Salvador 15,363 281 29 4,598,748 11,520 163
Georgia 1,155,881 53.4% 291 19,880,003
Honduras 7,265 464 400 17,100,000 6,996
Indonesia 55,479
Moldova 4,929,620 95.7% 84,239,288 73.0% 586 6,569 334 11,526 62 11,702,981 2,452 7,279 77
Nicaragua 9,104 9,104
Burkina Faso AFRICA 17,268,474 74.8% 74,339,448 95.3% 2,414 12,307 278 2,240 96 2,802,000 8,237 3,369 28
Cabo Verde I 5,167,848 97.6% 553 13 617,000 106
Ghana 5,202,887 100.0% 13,009,963 100.0% 66,930 1,724 514 16,740,762 59,060 535
Madagascar 31,366 324 1,892 1
Mali 9,077,220 98.2% 148,951,503 98.3% 1,308 97,503 500,000 801
Morocco 111,353,027 99.0% 40,863 114 53,376 31,578 34
Mozambique 28,830 186
Namibia 9,238
Senegal 9,690,173 86.3% 154,710,649 75.0% 1,519 38,391
Gender**
Female 227 67,733 107 121 924,102 17,660 20
Male 4,292 156,967 413 1,066 13,580,879 40,077 85

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts. Indicators in this Results Framework may be added, removed, or modified as MCC‘s investments in education evolve over time. All MCC education programs have as their long-term end goal an increase in individual or household income and a corresponding decrease in poverty.

* Gender totals may not match overall totals due to lack of gender counting in earlier compacts.

Education

Process Indicators Output Indicators Outcome Indicators
Country Region (E-1)
Value of signed educational facility construction, rehabilitation, and equipping contracts (USD)
(E-2)
Percent disbursed of educational facility construction, rehabilitation, and equipping contracts
(E-3)
Legal, financial, and policy reforms adopted
(E-4)
Educational facilities constructed or rehabilitated
(E-5)
Instructors trained
(E-6)
Students participating in MCC-supported education activities
(E-7)
Graduates from MCC-supported education activities
(E-8)
Employed graduates of MCC-supported education activities
MCC Total 208,031,689 92.4% 5 772 4,716 215,607 62,211
EAPLA Total 65,724,596 78.7% 5 66 2,107 48,599 16,252
AFRICA Total 142,307,093 98.7% 706 2,609 167,008 45,959
El Salvador I EAPLA 9,857,585 99.8% 22 378 30,672 4,285
El Salvador II
Georgia II** 27,687,683 52.0% 26 359 447
Mongolia 28,179,328 97.6% 5 18 1,370 17,480 11,967
Burkina Faso AFRICA 22,758,211 99.9% 396 557 31,065 4,035
Ghana 18,689,747 100.0% 250 41,019
Morocco 4,568,837 76.2% 2,052 93,424 41,383
Morocco II
Namibia 96,290,298 99.2% 60 1,500 541
Gender*
Female 2,420 72,963 36,990
Male 2,296 64,468 20,513

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts. Indicators in this Results Framework may be added, removed, or modified as MCC‘s investments in education evolve over time. All MCC education programs have as their long-term end goal an increase in individual or household income and a corresponding decrease in poverty.

* Gender totals may not match overall totals due to lack of gender counting in earlier compacts.
** (E-5) Number decreased from 30 to 26 because it was misreported in the previous quarter.

Land

Output Indicators Outcome Indicators
Country Region (L-1) Legal and regulatory reforms adopted (L-2) Land administration offices established or upgraded (L-3) Stakeholders trained (L-4) Conflicts successfully mediated (L-5) Parcels corrected or incorporated in land system (L-6) Land rights formalized (L-7) Percentage change in time for property transactions (L-8) Percentage change in cost for property transactions
MCC Total 127 399 76,531 12,433 338,393 321,508 NA NA
EAPLA Total 6 15 6,949 10,639 18,336 20,672  NA NA
AFRICA Total 121 384 69,582 1,794 320,057 300,836  NA NA
Indonesia EAPLA 3,029
Mongolia 6 15 3,920 10,639 18,336 20,672
Nicaragua
Benin AFRICA 50
Burkina Faso 54 78 61,057 1,364 18,490 4,793
Cabo Verde II 29 38 439 178 22,913 9,723
Ghana 4 3 427 23 1,481
Lesotho 11 1 575 151 53,296 21,753 -93
Madagascar 4 237
Mali 1 1,354
Mozambique 26 1,516 205,005 251,556
Morocco II
Namibia 19 2,524 8,869 4,356
Senegal 1,640 78 10,003 8,655
Gender*
Male 53,837 85,665
Female 21,538 55,141
Joint 18,802
Location*
Urban 195,308 154,475
Rural 89,789 124,608

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts. Indicators in this Results Framework may be added, removed, or modified as MCC‘s investments in education evolve over time. All MCC education programs have as their long-term end goal an increase in individual or household income and a corresponding decrease in poverty.

* Gender and location totals may not match overall totals due to lack of counting by gender and location in earlier compacts.

Power

Process Indicators Output Indicators
Country Region (P-1)
Value of signed power infrastructure feasibility and design contracts
(P-2)
Percent disbursed of power infrastructure feasibility and design contracts
(P-3)
Value of signed power infrastructure construction contracts
(P-4)
Percent disbursed of power infrastructure construction contracts
(P-5)
Temporary employment generated in power infrastructure construction
(P-6)
Generation capacity added
(P-7 and P-10) Km lines upgraded or built (P-8)
Transmission throughput capacity added
(P-9 and P-11) Substation capacity added (P-12)
Customers added by project
(P-13)
Maintenance expenditure-asset value ratio
(P-14)
Cost-reflective tariff regime
MCC Total 21,691,032 105.6% 489,000,472 68.6% 8,293 44 4,318 NA 84 35,412 NA NA
EAPLA Total 0.0% 0 0.0% 1,523 NA 35,412 NA NA
AFRICA total 21,691,032 105.6% 489,000,472 68.6% 8,293 44 2,796 NA 84 NA NA
El Salvador EAPLA 1,523 35,412
Georgia
Indonesia
Mongolia
Benin II AFRICA
Ghana 99
Ghana II
Liberia*** 101,773,325 100.0% 44 24 84
Malawi 5,943,608 98.0% 233,674,595 44.0% 4,220 2
Tanzania 15,747,424 108.6% 153,552,553 85.3% 4,073 2,673
T&D
Transmission
Distribution 4,294
Gender*
Female
Male
Grid
On-grid
Off-grid
Tariff class
Residential
Commercial
Industrial

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts.
*Gender totals may not match overall totals due to lack of gender counting in earlier compacts.
** This is a monitoring indicator and cannot be attributed solely to MCC investment.
*** Not all common indicator data for Liberia were included for this quarter as the data are still being verified.
****In Ghana II there are two utilities who report different SAIDI and SAIFI numbers. P-21 – ECG: 24.02, NEDCo: 35 P-22 – ECG: 23.57, NEDCo: 39.5

Power (continued)

Outcome Indicators
Country Region (P-15)
Total electricity supply
(P-16)
Power plant availability
(P-17)
Installed  generation capacity
(P-18)
Transmission system technical losses (%)
(P-19)
Distribution system losses
(P-20)
Commercial losses
(P-21)
System Average Interruption Duration Index (SAIDI)
(P-22)
System Average Interruption Frequency Index (SAIFI)
(P-23)
Total electricity sold
(P-24)
Operating cost-recovery ratio
(P-25)
Percentage
of households connected to the national grid
(P-26)
Share of
renewable energy in the country
MCC Total 13,796,863 NA 5,732 NA NA NA NA NA 1,810,250 NA NA NA
EAPLA Total 0 NA 0 NA NA NA NA NA 0 NA NA NA
AFRICA total 13,796,863 NA 5,732 NA NA NA NA NA 1,810,250 NA NA NA
El Salvador EAPLA
Georgia
Indonesia
Mongolia
Benin II AFRICA
Ghana
Ghana II 11,935,781 77.6 4,316 24.02; 35**** 23.57; 39.5****
Liberia*** 60,236 65 139 81 57 29,156 6 32
Malawi 1,800,846 108 327 23.2 18.3 1,455,324 67.60 100
Tanzania 949 325,769
T&D
Transmission
Distribution
Gender*
Female
Male
Grid
On-grid
Off-grid
Tariff class
Residential
Commercial
Industrial

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts.
*Gender totals may not match overall totals due to lack of gender counting in earlier compacts.
** This is a monitoring indicator and cannot be attributed solely to MCC investment.
*** Not all common indicator data for Liberia was included for this quarter as the data is still being verified.
****In Ghana II there are two utilities who report different SAIDI and SAIFI numbers. P-21 – ECG: 24.02,
NEDCo: 35 P-22 – ECG: 23.57, NEDCo: 39.5

Roads

Process Indicators Output Indicators Outcome Indicators
Country Region (R-1)
Value of signed road feasibility and design contracts
(R-2)
Percent disbursed of road feasibility and design contracts
(R-3)
Kilometers of roads under design
(R-4)
Value of signed road construction contracts
(R-5)
Percent disbursed of road construction contracts
(R-6)
Kilometers of roads under works contracts
(R-7)
Temporary employment generated in road construction
(R-8)
Kilometers of roads completed
(R-9) Roughness (R-10)
Average annual daily traffic
(R-11)
Road traffic fatalities
MCC Total 130,499,160 96.7% 4,465 2,345,958,621 88.8% 3,918 49,822 3,035 NA NA 655
EAPLA Total 64,075,771 93% 1,791 1,084,655,312 90% 1834.3 1,309 1,749
AFRICA Total 66,423,389 100% 2,675 1,261,303,310 87% 2083.4 48,513 1,286 651
Armenia EAPLA 24.4 3.47 735
El Salvador I 18,321,410 99% 223 248,378,825 97% 223.0 223.32
El Salvador II 32
Georgia 11,980,000 99% 197,299,030 100% 220.2 220.20 1.50 1,092
Honduras 9,500,000 75% 673 179,400,000 72% 673.0 610.10
Moldova 96 100,807,443 96% 96.0 1,309 96 4
Mongolia 6,083,650 89% 19.3 73,108,907 91% 176.4 176.40 1.90 353
Nicaragua 375.5 56,507,526 100% 74.0 74.0
Philippines 15,235,623 94% 222.0 173,156,531 81% 222.0 175.0
Vanuatu 2,955,088 100% 150 55,997,051 97% 149.7 149.70 3.00
Burkina Faso AFRICA 8,339,651 115% 536 140,205,145 102% 419.1 4,162 277.80 6
Cape Verde I 3,520,000 92% 63 24,280,000 100% 40.6 40.60 2.00
Ghana 5,549,044 100% 943 250,604,022 100% 446.4 35,455 445.03 602
Liberia
Mali 42,918,038 35% 81.0 79.00
Mozambique** 17,669,992 85% 253 132,240,557 88% 253.0 2,308 253
Senegal 12,201,371 102% 406 271,128,882 70% 375.0 2,757 *** 43
Tanzania 19,143,331 107% 473 399,926,666 91% 468.34 3,831 190.14
Gender*
Male 13,260 45
Female 1,197 4
Road Type*
Primary 65,222,944 23% 2,093 1,342,644,867 90% 1,867 1,177.58
Secondary 24,735,623 87% 1,374 617,229,323 85% 1,133 478.65
Tertiary 6,719,183 112% 935 164,505,401 66% 681 1,077.77

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts.
*Gender and road type totals may not match overall totals due to lack of counting by gender and road type in earlier Compacts.
** The kilometers of roads completed for Mozambique is provisional data. Subject to change after verification of takeover certificates.
*** According to the Common Indicator definition, a road is completed when official certificates are handed over and approved. In Senegal, this was taken to mean final acceptance of the road works, which typically happens after the end of the 1 year defects liability period which starts when the construction is completed and the roads are provisionally accepted. As part of its Compact, Senegal intended to rehabilitate 372 kilometers of national roads. By September 2015, when the Senegal Compact closed, no roads had achieved final acceptance, and therefore were not officially completed, per the common indicator definition. However, by the end of the Compact, 185km of roads had been fully rehabilitated and had received provisional acceptance. An additional 72km were provisionally accepted in November 2015, and the remaining 116km are anticipated to be provisionally accepted with the support of the Government of Senegal by mid-2016.

Water Supply, Sanitation, and Hygiene

Process Indicators Output Indicators
Country Region (WS-1)
Value of signed water and sanitation feasibility and design contracts (USD)
(WS-2)
Percent disbursed of water and sanitation feasibility and design contracts
(WS-3)
Value of signed water and sanitation construction contracts (USD)
(WS-4)
Percent disbursed of water and sanitation construction contracts
(WS-5) Temporary employment generated in water and sanitation construction (WS-6)
People trained in hygiene and sanitary best practices
(WS-7)
Water points constructed
MCC Total 57,878,874 96.1% 798,435,421 81.4% 21,459 12,135 1,181
EAPLA Total 5,250,665 96.2% 303,498,694 98.8% 3,825 2,406
AFRICA Total 52,628,209 96.1% 494,936,726 70.7% 17,634 9,729 1,181
El Salvador EAPLA 4,983,800 96.0% 10,451,448 97.5% 2,406
Georgia 266,865 100.0% 54,315,000 94.2%
Jordan 238,732,246 100% 3,825
Cabo Verde II**** AFRICA 730,419 82.0% 18,739,566 78.0% 759 32
Ghana 1,475,148 100.0% 13,949,465 100.0% 778 392
Lesotho 3,594,133 100.0% 59,733,645 89% 11,527 454 175
Mozambique 35,076,009 99.1% 169,500,497 87.5% 2,276 8,400 614
Tanzania 6,861,280 102.1% 45,403,796 81.1% 387
Zambia 4,891,220 64.0% 187,609,757 44.0% 2,685 65
Gender*
Female 1,059 5,777
Male 8,486 5,904

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts.
*Gender totals may not match overall totals due to lack of gender counting in earlier compacts.
** This is a monitoring indicator; any change over baseline data represents the current trend and does not represent the direct impact of the MCC‐investment.
*** Jordan’s M&E Plan has, throughout the life of the compact, defined hours of supply as hours/week. As such all documentation is in this form. The value here has been divided by 7 here to accurately reflect supply hours per day.
****(WS-8): In Cabo Verde II the utility is in transition and during this period it has experienced challenges with its billing system and low collection rates, which accounts for some of the high rates of Non revenue water.
****(WS-5): Number decreased due to a correction in previously recorded data in Cabo Verde II.
*****The current unit for volume of water produced has a discrepancy. MCC M&E is in the process of revising this common indicator to clarify and align with current industry standards.

Water Supply, Sanitation, and Hygiene (continued)

Outcome Indicators
Country Region (WS-8)
Non revenue water
(WS-9)
Continuity of service
(WS-10)
Operating cost coverage
(WS-11)**
Volume of water produced*****
(WS-12)
Access to improved water supply
(WS-13)
Access to improved sanitation
(WS-14)**
Residential water consumption
(WS-15)**
Industrial/Commercial water consumption
(WS-16)**
Prevalence of diarrhea
MCC Total 52.9% NA NA 220,152,344 NA NA NA NA NA
EAPLA Total 50.7%
AFRICA Total 55.1% 220,152,344
El Salvador EAPLA 83.0% 88%
Georgia
Jordan 50.7% 7.35*** 85.6% 67% 54.1 3.1
Cabo Verde II**** AFRICA 97.5% 14.6 64% 81.50% 75 22.0
Ghana 36.0
Lesotho 27.0%
Mozambique 23.4% 19.5
Tanzania 48.8% 113.1% 200,330,000 166.5 998,439.6
Zambia 47.0% 18 110.0% 19,822,344
Gender*
Female
Male

All program data are as of September 10, 2017. Data are preliminary and subject to adjustment. Grey shading indicates closed-out Compacts; data revision is not expected for these Compacts.
*Gender totals may not match overall totals due to lack of gender counting in earlier compacts.
** This is a monitoring indicator; any change over baseline data represents the current trend and does not represent the direct impact of the MCC‐investment.
*** Jordan’s M&E Plan has, throughout the life of the compact, defined hours of supply as hours/week. As such all documentation is in this form. The value here has been divided by 7 here to accurately reflect supply hours per day.
****(WS-8): In Cabo Verde II the utility is in transition and during this period it has experienced challenges with its billing system and low collection rates, which accounts for some of the high rates of Non revenue water.
****(WS-5): Number decreased due to a correction in previously recorded data in Cabo Verde II.
*****The current unit for volume of water produced has a discrepancy. MCC M&E is in the process of revising this common indicator to clarify and align with current industry standards.

FY 2018 Corporate Goals

For FY 2018, MCC management established four specific goals to guide agency planning and performance for the year. These goals build on MCC’s current strategic plan, NEXT, as the agency awaits incoming political leadership. As in past years, these corporate goals are the starting point for annual department and division goal-setting, from which staff develop their individual performance plans. Below you will find MCC’s FY 2018 corporate goals with a brief description of MCC’s progress to date.

Corporate Priority Progress
Advance and deliver high‐quality compacts and threshold programs. For program development, MCC is on target to present compact programs with Mongolia, Senegal and Sri Lanka to the Board in FY 2018, while closely monitoring progress on potential compact programs with Tunisia and Burkina Faso to ensure successful Board presentations in FY 2019. MCC is also monitoring ongoing governance challenges in Togo to determine the best path forward for the proposed Togo threshold program, while initiating compact and threshold program development, respectively, with Timor-Leste and the Gambia.For program implementation, highlights include the signing on the Cote d’Ivoire compact and the successful close out of MCC’s $66 million compact with Cabo Verde in November, as well as entry into force of the Niger compact in January 2018. MCC is also preparing for close out in Indonesia and Honduras, while closely monitoring implementation progress across the compact and threshold program portfolio.
Strengthen organization health and effectiveness. For FY 2018, MCC is focused on three improvements—reforming MCC’s performance management system, implementing targeted efforts to improve knowledge management, and creating tools to better link workforce decisions to agency business needs. For performance management, the agency launched a new recognition program and successfully completed the FY 2017 review cycle utilizing new agency-wide leadership dimensions/guidance. For knowledge management, MCC completed an assessment and is implementing key elements of the KM action plan. On workforce planning, the agency launched an organizational development assessment and continues to make progress on improved workforce demand tools.
Enhance operational and technical agility. As described elsewhere in this document, MCC launched an “efficiency challenge” to identify opportunities to improve and shorten the program development process, launched the new Star Report tool to consolidate and streamline reporting, rolled out a new U.S. market outreach strategy, and is piloting new program management tools for country partners to better and more consistently manage—and report to MCC about—compact projects/activities.
Advance MCC policy and legislative initiatives. In anticipation of MCC’s incoming leadership team, the agency is preparing several key policy and legislative initiatives for consideration by new leadership. Specifically, MCC continues to engage with Congress to obtain concurrent compact authority for the purposes of making regional investments, with legislation expected to be voted on by the full Senate and the House in early 2018. In addition, the agency has continued efforts to better assess and measure the impact of MCC programs/activities focused on policy and institutional reform.



Footnotes
  • 1. Cabo Verde II closed in November 2017 and updated beneficiary numbers will be available in February 2018. As a result, information on beneficiaries is not included in this document.
  • 2. The table includes estimates for compacts that have ERRs from which income benefit calculations can be drawn. Information for Indonesia is only available for one out of three projects at this time.
  • 3. These estimates do not include the projected beneficiaries of projects or activities that have been terminated or suspended by MCC (Madagascar, Honduras, Nicaragua, Mali, and Armenia). In the case of Madagascar, the estimates account for the compact’s early termination.
  • 4. The Present Value (PV) of Benefits is the sum of all projected benefits accruing over the life of the project, typically 20 years, evaluated at a 10% discount rate. Estimates are reported in millions of US$ in the year that the ERR analysis was completed. Because the PV of benefits uses a discount rate, these figures cannot be compared directly to the undiscounted financial costs of MCC compacts, but must be compared to the PV of costs instead.
  • 5. The table includes estimates for compacts that have ERRs from which income benefit calculations can be drawn. Information for Indonesia is only available for one out of three projects at this time.
  • 6. Column totals may not equal the sum of the individual rows due to rounding.
  • 7. https://data.MCC.gov/evaluations/index.php/catalog
  • 8. https://data.MCC.gov/evaluations/index.php/catalog
  • 9. https://www.MCC.gov/our-impact/principles-into-practice