Spreadsheet Files

Each compact project has a downloadable spreadsheet file containing:
  • A description of the project, including its economic rationale;
  • The expected project impacts, including detailed cost and benefit estimates;
  • A tool allowing users to modify key assumptions and study the effects of those modifications on the project’s returns.

What the spreadsheet data represents

  • An overall impact estimate. The spreadsheets provide MCC’s best estimate of the likely economic impact of the project, both during project implementation and for a period of years beyond it.
  • Estimated benefits. The spreadsheets estimate the expected increases in either incomes or value added of individuals, households, firms or sectors of economic activity.
  • A counterfactual scenario. Potential benefits are compared against what is likely to happen without the project (e.g., a growing economy would be expected to continue growing, even without the project).
  • A snapshot in time. The spreadsheets reflect the best data available to MCC at the time that the ERR was calculated.

What the spreadsheet data does not represent

  • The sole reason for an investment decision. Although ERRs are an integral part of MCC’s decision-making process, other factors are taken into account when MCC decides whether or not to undertake a project.
  • A detailed beneficiary analysis. The ERR spreadsheets portray the overall economic impact of a project rather than apportioning the income gains along various demographic dimensions.
  • Up-to-the-minute information for projects in implementation. ERRs are projections of estimated net benefits over time, rather than measurements of actual net benefits as they occur. Many of the parameters that are used in these estimates change, so ERRs may not reflect the actual implementation experience. When project designs or model parameters change significantly, MCC may revise these models; updated information will be posted here as it becomes available.